MANUFACTURING
MARGIN
All Manufacturing Margin videos
Operational insights

Why adding people does not always increase output

Find the manufacturing bottleneck before adding operators. Measure good output per labor hour and target the constraint.

Start with the constraint

If filling sets the pace, an extra operator at packing may leave total line output unchanged. The useful question is whether the added labor can remove the current constraint.

Measure a representative shift

Record good units, running time, stops, changeovers and waiting at each step. Persistent queues before a step and idle time after it can help identify the constraint. Check several jobs because product mix can change the limiting step.

Target the intervention

An operator keeping the filler supplied may help more than an additional packer. Test one change at a time, then compare good units per labor hour before and after. Include quality and safe work practices in the review.

Discuss your staffing question

Video transcript

Adding people doesn't always increase output. If your filler sets the pace, adding another person at the packing table may leave the filler unchanged. Find the bottleneck first. Measure output at each step, including stops and changeovers. Add labor where it removes a constraint, such as keeping the filler supplied. Then compare good units per labor hour before and after. Follow Manufacturing Margin for better manufacturing decisions.

AI-generated narration. Numerical examples are illustrative and are not client results.